True Path Ministry Inc. and the Iglesia Getsemani Church in Galeana, NL, Mexico work closely together for Christian ministry in the area. Our biggest joint project continues to be completing a new church building. Thanks to generous gifts from donors in the USA we were able to finish the interior walls with pre-colored stucco. This is a significant step forward for the project. It has brightened the worship space and the hearts of many Jesus followers in the area. Hallelujah!

The walls were constructed with cinder blocks and were roughed-in many months ago. Finishing the walls involved a two step process: adding a layer of concrete, filling in holes and repairing other imperfections; and the final step was to add a layer of texturized, colored concrete. Using the colored mortar means the walls will not have to be painted. This method saved time and money and left a much improved Interior.

While this was further progress there is still much work to do. The exterior walls need to be stuccoed/adding texturized colored concrete, the metal roof completed, adding men’s bathroom, doors on stalls in women’s bathroom and the lower level classrooms finished. We know God will provide in His time. If you feel moved to donate to the Galeana Church Construction project send a check to: True Path Ministry Inc., 1420 Moseley Road, Ennis, Texas 75119.

And whatever you do, do it heartily, as to the Lord and not to men, knowing that from the Lord you will receive the reward of the inheritance; for you serve the Lord Christ. Colossians 3:23-24

(Note: Click on a photo to see it larger)